In 2019, The City of North Bay trusted Power Precast to supply high quality precast culverts for the Pinewood Park Drive Creek Culvert Replacement Project. Power Precast provided and delivered 23 1800mm x 2400mm precast culverts including skewed ends for the twin cell run along with the precast headwalls required for this project. The headwalls were manufactured with a skew to perfectly align with the box culvert twin cell skew ends.
Pinewood Park Drive Cooks Creek Culvert Replacement
DESCRIPTION
DETAILS
- Contractor: MCA Contracting Limited
- Location: North Bay, ON
- Product Used: 2400x1800 Precast Box Culvert and Headwalls
- Date: Installed December 2019