Power Precast was trusted to design, produce, and supply 94.8 metres of 3300mm x 2400mm box culvert units for the Ontario Ministry of Transportation’s Highway 416 Interchange project in Casselman (MTO 2020-4091).
Hwy 417 Interchange – Casselman
DESCRIPTION
DETAILS
- Contractor: Green Infrastructure Partners
- Location: Casselman, ON
- Product Used: 3300mm x 2400mm Box Culvert
- Date: Summer 2022